The main function of the LNG import terminal is LNG receiving
storage and re-gasification
then supplying natural gas to power plants and city users by pipelines.Through building the dynamic models of each equipment in the LNG import terminal
and adding the necessary control systems
the process was simulated in dynamic mode
and then three operation conditions of the LNG import terminal were analyzed
including seasonal peak shaving
ship unloading and tank overpressure.During the peak shaving of LNG terminal
the power consumption of LNG send-out pump and in-tank pump changed with the same trend as the flow rate of export nature gas.Compressor power consumption and inlet flow rate of re-condenser
including BOG and LNG were affected by the ship unloading condition
which spent 13 h for the entire process.During the tank overpressure accident
which spent 15.2 h for the entire process
compressor power consumption
re-condenser pressure and inlet flow rate of re-condenser changed with the adjustment of compressor load.Finally
some suggestions on the design and operation of the LNG import terminal were proposed.