您当前的位置:
首页 >
文章列表页 >
Construction and performance research on double-tank heat pump water heating system
更新时间:2025-11-26
    • Construction and performance research on double-tank heat pump water heating system

    • CIESC Journal   Issue S2, Pages: 333-339(2016)
    • DOI:10.11949/j.issn.0438-1157.20161494    

      CLC: K5
    • Online First:30 December 2016,

      Published:30 December 2016

    移动端阅览

  • LU Lin, LIANG Caihua, ZHANG Xiaosong. Construction and performance research on double-tank heat pump water heating system[J]. CIESC Journal, 2016, (S2): 333-339. DOI: 10.11949/j.issn.0438-1157.20161494.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

172

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A resilient supply chain design method considering node disruption risk
Transcritical CO2 heat pump system with an ejector
Controlled synthesis of Bi2MoO6/MoO3 composite fibers via in-situ hydrothermal method and their high-efficiency photocatalytic hydrogen production performance
Multi objective optimization of flow and heat transfer characteristics of modified manifold microchannel heat sink based on machine learning
Study on impact of impurities in coal chemical waste salt on solvation of NaCl and Na2SO4

Related Author

YU Yang
LUO Yiqing
WEI Ronghui
ZHANG Wenhui
YUAN Xigang
ZOU Chunmei
CEN Jiwen
LIU Pei

Related Institution

School of Chemical Engineering and Technology, Tianjin University
Chemical Engineering Research Center, Tianjin University
State Key Laboratory of Chemical Engineering, Tianjin University
Laboratory of Advanced Energy Systems, CAS Key Laboratory of Renewable Energy, Guangzhou Institute of Energy Conversion, Chinese Academy of Sciences
College of Chemistry and Materials Engineering, Hainan Vocational University of Science and Technology
0