The overall process scheduling problem of polyvinyl chloride (PVC) production by calcium carbide method is studied in this paper
which is a hybrid system involving all production sections from calcium carbide production process and brine electrolysis process to polymerization of vinyl chloride (VCM). Calcium carbide production and VCM polymerization are batch processes
while other processes are continuous ones. Two hypothesis are made based on the process characters. Then the cost of electricity consumption
inventory
changeover and delivery delay is considered as an optimization objection
and the mixed integer linear programming (MILP) model of scheduling is constructed. The model is validated by a case of a PVC plant and comparing with the model with constant productivities of continuous stages.
Optimization method of coal-based cooling, heating and power co-generation
Damping optimization method for heat exchange network synthesis
Research progress on crude oil operation optimization
Application of adaptive algorithm of online reduced KECA in fault detection
Multi factor production cost modeling method for intelligent manufacturing
Related Author
DUAN Wenting
ZHANG Qiao
Weiwei LIU
Guomin CUI
Lu ZHANG
Yuan XIAO
Qiguo YANG
Guanhua ZHANG
Related Institution
School of Chemical Engineering and Technology, Xi’an Jiaotong University
School of Energy and Power Engineering, University of Shanghai for Science and Technology, Shanghai Key Laboratory of Multiphase Flow and Heat Transfer in Power Engineering
Department of Automation, College of Information Science and Engineering, China University of Petroleum
College of Information Engineering, Shenyang University of Chemical Technology
Institute of Cyber-Systems and Control, Zhejiang University