您当前的位置:
首页 >
文章列表页 >
Gas trial and related gas quantity calculation for the first LNG ship of China
更新时间:2025-12-10
    • Gas trial and related gas quantity calculation for the first LNG ship of China

    • CIESC Journal   Issue S1, Pages: 110-117(2009)
    • Online First:30 December 2009,

      Published:30 December 2009

    移动端阅览

  • WEI Guanghua, XIAO Hongyuan, ZHU Xiaohua. Gas trial and related gas quantity calculation for the first LNG ship of China[J]. CIESC Journal, 2009, (S1): 110-117. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

405

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Comparison between liquefied natural gas,pipe natural gas and substitute natural gas
International LNG industry cooperated trendand overseas strategy
Numerical simulation of LNG leakage fire temperature distribution from pipeline in tunnel
Simulation of small-scale natural gas liquefaction flows in skid-mounted package
Performance study of gas-liquid vortex separators under low cross-sectional gas velocity

Related Author

WANG Xiaowu
HUA Ben
梁永宽
QIAN Xinming
LIU Mu
LIU Zhenyi
CAO Wensheng
LU Xuesheng

Related Institution

华南理工大学理学院
华南理工大学化工学院
中山大学工学院
北京理工大学爆炸科学与技术国家重点实验室
上海交通大学制冷与低温工程研究所
0