Natural gas purification and liquefaction process of small-scale LNG project in skid-mounted package
|更新时间:2025-12-10
|
Natural gas purification and liquefaction process of small-scale LNG project in skid-mounted package
CIESC JournalIssue S1, Pages: 100-105(2009)
作者机构:
1. 集美大学机械工程学院
2. 上海交通大学制冷与低温工程研究所
作者简介:
基金信息:
DOI:
CLC:
Online First:30 December 2009,
Published:30 December 2009
稿件说明:
移动端阅览
CAO Wensheng, LU Xuesheng, LIN Wensheng, et al. Natural gas purification and liquefaction process of small-scale LNG project in skid-mounted package[J]. CIESC Journal, 2009, (S1): 100-105.
DOI:
CAO Wensheng, LU Xuesheng, LIN Wensheng, et al. Natural gas purification and liquefaction process of small-scale LNG project in skid-mounted package[J]. CIESC Journal, 2009, (S1): 100-105.DOI:
Natural gas purification and liquefaction process of small-scale LNG project in skid-mounted package
the small-scale natural gas liquefier has attracted more and more attention at home and abroad
due to its small volume
mobile transportation
convenient start-up and shut-down
as well as skid-mounted package.In this paper
technologic design of the small-scale liquefied natural gas plant in skid-mounted package is carried through based on No.1 station outgoing gas of 23th gas field of Zhongyuan oil field.The simulative calculation of the small-scale LNG project achieves temperature
pressure
enthalpy
entropy
flow rate
component mole fractions in liquid and gas phase of every node in the whole process that using the methods of compound modularized adsorption technology and SP-MRC refrigeration.The result shows LNG recovery is more than 90% and power consumption cost is only 0.379 kW·h·m-3