save and boil off the liquefied natural gas transferred by the marine LNG tanker before it is sent to the customer.Cooperated with the PTC
IRC designed a small experimental facility with rated flow rate of 2m3·h-1 to simulate the operation and manipulation process of a practical LNG receiving terminal.Inside the general unload
save and boil off processes
the facility can provide the experimental base for the LNG flow characteristics
inspection of the cryogenic valve and the risk evaluation in case of the LNG leakage
and the extensive construction in the future is also considered.The aim of the facility is to accumulate the operating and manipulating experience on the aspect of the LNG receiving terminal.The present paper provides the design of the flow chart for the facility and the numerical simulation results are also presented with the software AspenPlus.