Fuzzy-control parameters for nitrogen removal of saline sewage in SBR process
|更新时间:2025-12-10
|
Fuzzy-control parameters for nitrogen removal of saline sewage in SBR process
CIESC JournalIssue 4, Pages: 995-100(2008)
作者机构:
北京工业大学,北京市水环境恢复与水污染控制重点实验室,北京,100022
作者简介:
基金信息:
DOI:
CLC:
Online First:05 April 2008,
Published:05 April 2008
稿件说明:
移动端阅览
YE Liu, PENG Yongzhen, TANG Bing, et al. Fuzzy-control parameters for nitrogen removal of saline sewage in SBR process[J]. CIESC Journal, 2008, (4): 995-100.
DOI:
YE Liu, PENG Yongzhen, TANG Bing, et al. Fuzzy-control parameters for nitrogen removal of saline sewage in SBR process[J]. CIESC Journal, 2008, (4): 995-100.DOI:
Fuzzy-control parameters for nitrogen removal of saline sewage in SBR process
In order to investigate the feasibility and validity of using fuzzy-control strategy for nitrogen removal of saline sewage in the sequence batch reactor (SBR) process
the real saline sewage was treated firstly in this experiment and the variation patterns of dissolved oxygen (DO) and pH value during the removal of organic matter
nitrification and denitrification were studied in detail with fresh sewage and saline sewage at salinity 10 g8226;L-1
20 g8226;L-1
35 g8226;L-1 during steady state and salinity shock periods.The results showed that the characteristic points and platforms of pH value detected in saline sewage were repeated very well and had the same regularity but DO curve changed a lot with different regularities .The characteristic points a (break point)
b (ammonia valley)
c(nitrate apex)could indicate the completion of organic matter degradation
nitrification and denitrification.Points a and b would appear late in the sewage with a high salinity.During the salinity shock periods
the pH value also changed with the same regularity though the characteristic points appeared in different times.However
when the salinity was above 30 g8226;L-1 the pH curve became flat.Points a and b would not appear until the aeration time was prolonged but c was influenced little.Because during the shock periods the nitrification oxidation bacteria were inhibited at first
then were ammonia oxidation bacteria
and the denitrification bacteria were inhibited at last.pH should be used as the fuzzy-control parameter for nitrogen removal of saline sewage in sequence batch reactor (SBR) process.
Nitrogen removal from medium-age landfill leachate via anaerobic/aerobic/anoxic process in SBR
Biological treatment of high concentration NO2--N in passivation washing wastewater and process control strategy
Dynamic DO simulation of aerobic nitrification in SBR with constant aeration intensity:parameter estimation and accuracy assessment
Advanced nitrogen removal of landfill leachate in single stage oxic pulsed SBR process
Realization of CANON process in biofilter for wastewater with low ammonia and room temperature
Related Author
PENG Yongzhen
LIU Wenlong
ZHANG Weitang
CAO Tianhao
MIAO Lei
WANG Shuying
LI Zhongming
WANG Shuying
Related Institution
Key Laboratory of Beijing Water Quality Science and Water Environment Recovery Engineering, Beijing University of Technology
Key Laboratory of Beijing for Water Quality Science and Water Environment Recovery Engineering, Engineering Research Center of Beijing, Beijing University of Technology
Key Laboratory of Beijing for Water Quality Science and Water Environmental Recovery Engineering, Engineering Research Center of Beijing, Beijing University of Technology
Key Laboratory of Beijing for Water Quality Science and Water Environmental Recovery Engineering, Beijing University of Technology
College of Civil Engineering and Architecture, Zhejiang University of Technology