SUPPLY CHAIN LONG RANGE PLANNING AND INVESTMENT DECISION MAKING SYSTEM IN CHEMICAL INDUSTRY
|更新时间:2025-12-10
|
SUPPLY CHAIN LONG RANGE PLANNING AND INVESTMENT DECISION MAKING SYSTEM IN CHEMICAL INDUSTRY
CIESC JournalIssue 5, Pages: 659-664(2003)
作者机构:
华南理工大学传热强化与过程节能教育部重点实验室
作者简介:
基金信息:
DOI:
CLC:
Online First:25 May 2003,
Published:25 May 2003
稿件说明:
移动端阅览
ZHOU Zhangyu, ZENG Mingang, CHENG Siwei, et al. SUPPLY CHAIN LONG RANGE PLANNING AND INVESTMENT DECISION MAKING SYSTEM IN CHEMICAL INDUSTRY[J]. CIESC Journal, 2003, (5): 659-664.
DOI:
ZHOU Zhangyu, ZENG Mingang, CHENG Siwei, et al. SUPPLY CHAIN LONG RANGE PLANNING AND INVESTMENT DECISION MAKING SYSTEM IN CHEMICAL INDUSTRY[J]. CIESC Journal, 2003, (5): 659-664.DOI:
SUPPLY CHAIN LONG RANGE PLANNING AND INVESTMENT DECISION MAKING SYSTEM IN CHEMICAL INDUSTRY
Traditional studies on long-range planning and process debottlenecking mainly focus on the net present value of production process only
by using the MILP/MINLP approaches.However
MILP/MINLP approaches are lack of flexibility to solve multi-objective problems with sustainability being considered. Moreover
process debottlenecking and investment evaluation are executed as two separate processes.In this paper
a supply chain long range planning and investment decision making system is proposed for supply chain debottlenecking and investment decision making simultaneously with sustainability being considered.At first
a hierarchical structure of investment evaluation and decision making system is set up under three strategic objectives-enterprise benefits
social benefits and customer benefits. Secondly
the relative weights of various qualitative and quantitative elements in the hierarchical structure are evaluated by using the analytical hierarchy process (AHP).Thirdly
a multi-objective multi-period mixed integer nonlinear programming model is formulated to streamline the operations and suggest design modifications that will improve the efficiency and sustainability of the supply chain. It can be utilized to anticipate the impact of market changes and introducing new unit process
thus supply chain bottlenecks can be identified and debottlenecking actions can be recommended.Finally
goal programming is utilized to solve the multi-objective multi-period mixed integer nonlinear programming model and optimized investment project or coupled projects are selected. The application of this integrated system is illustrated by a practical example.