A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS
|更新时间:2025-12-10
|
A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS
CIESC JournalIssue 9, Pages: 1251-1256(2003)
作者机构:
清华大学化学工程系,北京,100084
作者简介:
基金信息:
DOI:
CLC:
Online First:25 September 2003,
Published:25 September 2003
稿件说明:
移动端阅览
WU Jianyu, HE Xiaorong, CHEN Bingzhen, et al. A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS[J]. CIESC Journal, 2003, (9): 1251-1256.
DOI:
WU Jianyu, HE Xiaorong, CHEN Bingzhen, et al. A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS[J]. CIESC Journal, 2003, (9): 1251-1256.DOI:
A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS
Batch processes are widely used in producing many high-value chemical products for its good flexibility. However
the production and costeffectiveness of batch plants mostly depend on short-term scheduling. The construction of traditional models for batch scheduling relies on the definition of time slots or time events
which lead to the result that many binary variables are involved in the models and it takes much time to solve the problems with the branch and bound method.A new kind of model for scheduling of multi-product batch plants is presented. The new model uses a continuous-time domain representation that does not rely on the definition of time slots or time events. The symmetrical and complemental feature of binary variables is also considered to simplify the model. As a result
the number of binary variables of the new model is successfully reduced to no more than half of the traditional ones. A medium-scale example is presented to prove that the new model quickly solve and reach the global optimal result. Comparisons with traditional model are also provided with large-scale problems. Moreover
the principle of the new model can be not only used in the multi-product problem
but also easily applied in other aspects such as multi-purpose batch scheduling and so on.