您当前的位置:
首页 >
文章列表页 >
A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS
更新时间:2025-12-10
    • A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS

    • CIESC Journal   Issue 9, Pages: 1251-1256(2003)
    • Online First:25 September 2003,

      Published:25 September 2003

    移动端阅览

  • WU Jianyu, HE Xiaorong, CHEN Bingzhen, et al. A NEW CONTINUOUS-TIME MILP MODEL FOR SCHEDULING OF MULTI-PRODUCT BATCH PLANTS[J]. CIESC Journal, 2003, (9): 1251-1256. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

211

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimal multi-period operational planning of steam power systems using improved particle swarm optimization method
Thermo-gas-elastic coupling performance analysis of high-speed and high-temperature foil face seals
Thermodynamic performance of tower-type solar-assisted supercritical compression CO2 energy storage system
Identification of gas-liquid two-phase flow patterns in a riser based on recursive characteristics and CNN
Heat transfer mechanisms, bottleneck identification and optimization in heat exchanger networks under variable operating conditions

Related Author

DAI Wenzhi
YIN Hongchao
CHI Xiao

Related Institution

大连理工大学能源动力学院,海洋能源利用与节能教育部重点实验室
0